
PVC Ceiling Panel Extrusion Production Making Machine
Qingdao Suke Machinery Co., Ltd.- Product Type:PVC Profile
- Automatic Grade:Automatic
- Power Source:Electric
- Screw Design:Double-Screw
- Certification:CE, ISO9001:2008
- Condition:New
Base Info
- Model NO.:SJSZ51x110
- Customized:Customized
- Automation:Automatic
- Computerized:Computerized
- Screw:Double-Screw
- Material:Stainless Steel
- Power Supply:380V Three Phase
- Inverter:ABB
- Intelligent Temperature Controller:Omron From Japan
- Control System:PLC Control System
- Warranty:12monthes
- After Sale Service:Life Long with Professional After Sale Team
- Transport Package:PE Film and Wooden Package
- Specification:CE ISO9001
- Trademark:suke
- Origin:Qingdao, China
- HS Code:84775900
- Production Capacity:25sets,Year
Description
Hauling and cutting machineDimension(m) 5.8*1.1*1.7 5.8*1.1*1.7 3.1*1.3*1.7 2.2*1.45*1.8 3.55*1.85*1.6 2.5*1.8*1.6 Hauling speed (m/min) 0-4 0-4 0-3 0-2 Hauling force (N) 30000 30000 35000 50000 Max cutting area and width (mm) 240*65 240*65 500*80 800*80 Installed power (KW) 6 6 8 8 Stacker Stacking length(mm) 6 6 6 6


TRADE TERMS:
1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
2. Delivery Time: 40 days after receipt of prepayment.
3. Packing Method: Packing film or wooden case
4. Guaranteed Time: 12 months
MACHINE TEST AND AFTER SERVICE:
1. When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.




TRADE TERMS:
1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
2. Delivery Time: 40 days after receipt of prepayment.
3. Packing Method: Packing film or wooden case
4. Guaranteed Time: 12 months
MACHINE TEST AND AFTER SERVICE:
1. When machine finished, we will invite client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.

