
Yx8-538 Roll Forming Machine
XIAMEN FUMING ROLL FORMING MACHINERY CO., LTD.- Tile Type:Gi, PPGI, Aluminum,Stainless Steel,Colored Steel
- Certification:CE, SGS
- Condition:New
- Customized:Customized
- Usage:Roof, Wall
- Transmission Method:Gear,Sprocket, Gear Box , Toroidal Worm Box
Base Info
- Model NO.:YX8-538
- Warranty:12 Months
- Thickness:0.25mm-0.5m
- Yield Strength:350 MPa
- Color:Customized
- Transport Package:Container
- Specification:40GP
- Trademark:FUMING
- Origin:Xiamen
- HS Code:8455229090
- Production Capacity:10sets,Month
Description
YX8-538 ROLL FORMING MACHINEDrawing Material Specification Thickness 0.25mm to 0.5mm Effective width 538mm Feeding width Approx.610mm Material PPGI, Yield strength 350MPa Machine Components 5Tx650mm Simple Decoiler Load capacity Max.5Tons Coil inner-diameter 508±30mm Coil outer-diameter 1500mm Coil width Max.650mm Unpower Option Please refer to decoiler Entry Bench and Manual Pre-shearing device Working thickness Up to 0.8mm Function Smart cut control, to cut off the end of the final piece of sheet only Option Hydraulic pre-shearing device Roll Forming Machine Driving system Gear/sprocket Option for driving system Gear box or toroidal worm box Forming station 12 stations Roller material 45# steel, CNC lathes, hard chrome coated Option for roller material Cr12, Cr12Mov Shafts Diameter Ø60mm Main motor 5.5KW Line speed of rollformer Approx. 18-20m/min or customized Hydraulic Cutting Device Cutting type No Blanking cut Cutting tool material Cr12, heat treatment Hydraulci pump motor 4KW PLC Control System Function Control the quantity & cutting length automatically PLC Siemens Touch screen Siemens Inverter Delta/Schneider Encoder Omron Cut-to-length tolerance ≤±2 mm or customized Control Voltage 24V Product Rack Un-powered, three units Option Run out table Payment Terms FOB contract: 30% payment by T/T is required as deposit within ten (10) business days since the contract signing date. 70% balance payment is required by T/T prior to shipment. CFR or CIF contract: 30% payment by T/T is required as deposit within ten (10) business days since the contract signing date. 70% balance payment is required by T/T prior to shipment or by irrevocable and non-transferable L/C at sight, to be established at least one month before shipment Warrnanty In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory . If installation is needed, Fuming(the seller) will dispatch a technician to the buyer's factory abroad to assist commissioning the machine with charge free. The buyer should assist Fuming to get the Chinese technician's visa and should pay for the roundtrip air ticket, local accommodation and food.