Building Material Making Machinery

PVC/WPC Three Layer Foam Board Extrusion Line/PVC Multi Layer Foam Board Production Line

Qingdao Sanyi Plastic Machinery Co., Ltd.
  • Product Type:Extrusion Molding Machine
  • Engagement System:Full Intermeshing
  • Screw Channel Structure:Deep Screw
  • Type:Sheet Extruder
  • Screw:Twin-Screw
  • Automation:Automatic

Base Info

  • Model NO.:SJSZ80,156
  • Computerized:Computerized
  • Plastic Processed:PVC
  • Feeding Mode:One Feed
  • Assembly Structure:Separate Type Extruder
  • Exhaust:Exhaust
  • Transport Package:on Demand
  • Specification:1220x2440mm
  • Trademark:Sanyi
  • Origin:China
  • HS Code:847780000
  • Production Capacity:350-400kg,H

Description

 company Technical configuration
Specification of Pvc foam board Machine
Name
Description
DETAILS
1
SJSZ 80/156 Conicaltwin Screw Extruder
ABB frequency converter,
SIEMENS conto actor, OMRON Japan
2
Mould
hanger type extruding mould 
3
Foaming Machine
4 phase calibrating device
4
Cooling tank and bracket
Length:6000mm 
5
Haul-off unit Gear transmission
8 couples
(Cylinder clamping and loosening)
6
Automatic Cutting unit
1set (controlled by ABB inverter)
7
Stacker machine
1set
8
Colling Chiller 20P
1set
9
Dust exhaust device
2 sets
Auxiliary machine
1
500/1000Mixer
500L or 1000 L mixer
(controlled by Inverter)
2
660Grinder
feeder controlled by ABB Inverter,
with automatic dust collector
3
SWP 380 Crusher
rotation blades 9 pcs
ATTENTION
1
Main motor frequency controller : siemens or ABB
2
Temperature controller : OMRON or RKC
3
AC controller : Schneider or simens(As customer requirement)
4
Thermal overload relay : Schneider
5
Switch : DELIXI or Schneider
6
All electrical units on components from standard companies like OMRON/RKC/Siemens
                After-sales service
Technical documents
All labels on machines and lay-out drawings, Electrical diagram, User Manual, will be in English.
   should send all necessary files to the buyer since the third week since project execution. All documents in hard copies should be also shipped with machines together.
Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. Engineer will give free training lessons to labors in buyer's factory.
Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
b.Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, RUNJIA will provide spare parts without any charge in case of quality discrepancy caused by us.
 If the malfunctions are caused by your incorrect operations, RUNJIA will provide the buyer spare parts at cost price.
 Long-term service:
 
we will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
PVC multi layer foam board production line