Building Material Making Machinery

Highway Guard Bar Plate Roll Forming Machine China

HEBEI XINNUO ROLL FORMING MACHINE CO., LTD.
  • Tile Type:Colored Steel
  • Certification:CE, ISO, as You Like
  • Condition:New
  • Customized:Customized
  • Usage:Roof, Wall, Guardrail Panel
  • Transmission Method:Electric

Base Info

  • Model NO.:highway guard bar plate roll forming machine
  • Color:as You Like
  • Trade or Factory:Factory
  • Guarantee:1 Year
  • Life Time:10 Years
  • Service:Provide Engineer to Install The Machines
  • Brand Name of PLC:as Customer Request
  • Drawing:Designed as Customer Request
  • Power:38V, 50Hz, 3 Phrase or as Your Like
  • Decoiler Type:Manul, Electric, Hydraulic
  • Control System:PLC
  • Transport Package:Main Machine Nude Packing with Plastic Film
  • Specification:5800*1500*1500
  • Trademark:KXD
  • Origin:China
  • HS Code:8455221000
  • Production Capacity:30 Sets Per Month

Description

               Main parameters of highway guardrail machine Suitable to processColor steel plate, galvanized sheet,aluminum coils and etc.2 Effective width 310mm3Roller station17 rows forming
7 roller leveling4Thickness of feeding material2.0-2.5 mm5Productivity 8-12m/min6Rollers' material45# forging steel7Diameter of shaft100mm8Cutting tool material: Cr12 with quenched treatment 60-62°C9Weight About 6.9T10Size 13.5*1.85*1.6mm11Voltage380V  50Hz 3phases12Wall thickness of main forming machine14mm steel plate13Main forming machine body300 mm H steel14Total power 22+11 kw15Leveling power2.2 kw Processing technique and deployment
Processes: 10T Hydraulic de-coiler-Leveling device--Punching station--Roll forming machine-PLC system-Hydraulic system-Cutter-Output table
 

3.the picture of the  highway guardrail roll forming machine




                              4.The production process                           
 
Decoiler→Flating→Feeding →Forming→Cut to length→Colletion---(finish goods)
 
                              5.Production Flow                                      
 
                            6.Packaging & Shipping                            
  Main machine is nude, the computer control box is packed with wooden frame

                   7.company overview
8.FAQ    
1:How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2:How to visit our company:
Fly to Beijing airport:   By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao  to Cangzhou Xi(4.5 hours),then we can pick up you.
If any questions,you can call me mobile phone at any times 
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4:If you want to get more pictures or videos of the machines,I can send them to you by Email or SKype.
 
9.Contact information
CONTACT PERSON:helen wang