
Roll Forming Machine for Decking Yx70-311-622
XIAMEN FUMING ROLL FORMING MACHINERY CO., LTD.- Tile Type:Gi, PPGI, Colored Steel
- Certification:CE, SGS
- Condition:New
- Customized:Customized
- Usage:Roof, Wall
- Transmission Method:Gear,Sprocket, Gear Box or Toroidal Worm Box
Base Info
- Color:Customized
- Warranty:12 Months
- Thickness:0.8mm-1.2mm
- Feeding Width:Approx.865mm
- Transport Package:Container
- Specification:40GP
- Trademark:FUMING
- Origin:Xiamen
- HS Code:8455229090
- Production Capacity:15 Sets,Month
Description
YX70-311-622 ROLL FORMING MACHINEDrawing
Material Specification Thickness 0.8mm to 1.2mm Effective width 622mm Feeding width Approx.865mm Material GI Yield strength 550MPa Machine Components 5Ton*1250mm Hydraulic Decoiler Coil inner hole expanding Hydraulic system, 3KW pump motor Speed regulating Frequency inverter, 3KW motor Expanding type Taper wedge expanding system Load capacity Max.5Tons Coil Inner-diameter 510±30mm Coil width Max.1250mm Stop/start rotation Automatic stopping device with limited switch to assist Option Please refer to decoiler Roll Forming Machine Driving system Gear/sprocket Option for driving system Gear box or toroidal worm box Forming station 18 stations Roller material 45# steel, CNC lathes, hard chrome coated Option for roller material Cr12, Cr12Mov Shafts Diameter Ø95mm Main motor 11KW*2 Line speed of rollformer Approx. 18m/min or customized Hydraulic Cutting Device Cutting type Slug Breaker Cutting tool material Cr12, heat treatment Hydraulci pump motor 5.5KW PLC Control System Function Control the quantity & cutting length automatically PLC Siemens Touch screen Siemens Inverter Delta Encoder Omron Cut-to-length tolerance ≤±2 mm or customized Control Voltage 24V Product Rack Un-powered, three units Option Run out table Payment Terms FOB contract: 30% payment by T/T is required as deposit within ten (10) business days since the contract signing date. 70% balance payment is required by T/T prior to shipment. CFR or CIF contract: 30% payment by T/T is required as deposit within ten (10) business days since the contract signing date. 70% balance payment is required by T/T prior to shipment or by irrevocable and non-transferable L/C at sight, to be established at least one month before shipment Warrnanty In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory . If installation is needed, Fuming(the seller) will dispatch a technician to the buyer's factory abroad to assist commissioning the machine with charge free. The buyer should assist Fuming to get the Chinese technician's visa and should pay for the roundtrip air ticket, local accommodation and food.