C Z Purlin Fast-Change Roll Forming Machine
HEBEI XINNUO ROLL FORMING MACHINE CO., LTD.- After-sales Service:Door to Door
- Warranty:1 Year
- Certification:CE, ISO9001
- Customized:Customized
- Condition:New
- Control Type:PLC
Base Info
- Model NO.:purlin machine
- Automatic Grade:Automatic
- Product Name:CZ Purlin Machine
- Raw Material:45# Steel
- Control System:PLC
- Color:Customers Requirement
- Roller Material:45# Forged Steel
- Shaft Material:High Grade No.45 Forged
- Cutting Blade Material:Cr 12 High Grade Steel
- Name:Purlin Machine
- Main Frame:350h-400h Steel
- Changing Size:Full Automatic
- Transport Package:Main Machine Is Nude
- Specification:10.3*1.3*1.6m
- Trademark:XN
- Origin:Hebei
- HS Code:8455221000
- Production Capacity:15 Sets Per Month
Description
Overview
Detailed Photos
Product Description
Cr12, hardness HRC60-62. Treating process: heat treatment- plane abrasion- wire electrode cutting. Delta DVP 14ES Frequency Converter Omron, made in Japan. It features with high accuracy and stability.
FAQ
5.FAQ
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we
can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours)
then we can pick up you.
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
Product Description
Cutting
Blade Material
C. Electric Components
PLCwell-adapted to various conditions, such as moisture,
electromagnetic disturbance.
DeltaVFD-M. It has the advantage of slowing down before cutting,
to ensure the length accuracy (±1mm,
far better than industrial standard ±3mm).
Length
Measurement Device
Company Profile
FAQ
5.FAQ
1:How to play order:
Inquiry---confirm the profile drawings and price----confirm the PI--arrange the deposit or L/C---then OK
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we
can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours)
then we can pick up you.
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.