
Roof and Wall Tile Rolling Machine Manufacture
Cangzhou Dixin Roll Forming Machine Co., Ltd.- Tile Type:Colored Steel
- Certification:CE, ISO
- Condition:New
- Customized:Customized
- Usage:Roof, Wall, Roof and Wall
- Transmission Method:Machinery
Base Info
- Model NO.:roof and wall roll forming machine
- Color:Blue
- Thickness of Plate:0.3-0.8mm
- Roller:High Grade 45# Steel
- Shaft:75mm
- Control System:PLC
- Hydraulic Pump Station:4kw
- Motor Power:5.5kw
- Forming Steps:13
- Cutter:Cr12
- Method:Hydraulic Pressure
- Transport Package:Nude, Covered with Plastic Film
- Specification:CE SGS
- Trademark:DIXIN3
- Origin:Botou, Hebei, China
- HS Code:84552210
- Production Capacity:30 Sets,Month
Description
Specifications for double deck roll forming machine
1
Processing material
aluzinc/galvanized steel/colored steel coil
2
Material thickness
0.3-0.8mm
3
Main motor power
4 kw
4
Pump power
4 kw
5
Shaft diameter
75mm
6
Forming steps
13 steps
7
Roller material
45# forged steel, with hard chrome plating
8
Main frame
300H steel
9
Medium plate thickness
16mm
10
Control systerm
PLC computer control with inverter
11
Power supply
380V, 3 Phase, 60Hz or as your requirement
12
0veral sized
about mm*mm*mm
Please Note: All the parameters can be designed as your requirement.
Let me show you how to operate Steel Bamboo Roofing Sheets Making Machine :
Decoiling→Feeding & Guiding→Roll Forming→ Cutting→Finished Products To Support Table
Packaging & Shipping
Packing Method:Main machine is packaged with plastic film
Transportation:All machines need one 40 feet container to hold
Payment Term :30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time:Within 35 days after receiving deposit.
Our Services
Installation (optional by the buyer)
a.After the machine arrives at the destination, the seller will send technician to the buyer's factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.
b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller's technicians departure): 5 days
c.The buyer pays the installation charges to the seller's appointed account before the technician departure: USD1,000 per set.
d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)
e.The buyer pays the seller's technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.
f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
Company Information
Our machines feature beautiful appearance, long service life, good performance, simple operation, reasonable price, good quality and so on.
Strong technical resources are the most stable guarantee for our products' quality. We adopt computer software for design drawing, production drawing and installation drawing for steel construction equipment. We adopt advanced computer digital inspection and produce high quality light steel structure equipment. Our technical is updating day by day!
Terms of payment
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Contact me
Any interested in our products ,please feel free to contact me !