Building Material Making Machinery

Easy to Operate Pipe Production Line with Stacking Machine

Jiangsu Aceretech Machinery Co., Ltd.
  • After-sales Service:Local Service Available
  • Warranty:Two Year
  • Pipe Material:Stainless Steel,Aluminum Alloy,Steel,Carbon Steel
  • Condition:New
  • Customized:Customized
  • Theory:Inverter

Base Info

  • Model NO.:VZH-20
  • Application:Steel Tube
  • Type:High Frequency Weld Pipe Mill Line
  • Machine Type:Stainless Steel Pipe Making Machine
  • Electric Components:ABB, Ls, Omron, or Customized
  • Sample/Service Manua:Available
  • Factory Location:2 Hours Drive From Shanghai
  • After-Sale Service:Free Spare Parts
  • Advantage:Famous Brand Motor
  • Business Type:Manufacturer
  • Material:Iron
  • Certification:CE,ISO,Patents
  • MOQ:1PC
  • Control:P.L.C Control(Imported Brand)
  • Transport Package:Wooden Pallet
  • Specification:Customzied
  • Trademark:ACERETECH
  • Origin:Jiangsu Zhangjiagang
  • HS Code:8477209000
  • Production Capacity:100sets,Year

Description

Overview

Product Description

Product Parameters

Final Products

Easy to Operate Pipe Production Line with Stacking Machine

Flow Chart

Easy to Operate Pipe Production Line with Stacking Machine

Product Details

Easy to Operate Pipe Production Line with Stacking Machine

Easy to Operate Pipe Production Line with Stacking MachineEasy to Operate Pipe Production Line with Stacking MachineEasy to Operate Pipe Production Line with Stacking MachineEasy to Operate Pipe Production Line with Stacking Machine

CONTACT US

 

FAQ

YOU ARE WELCOME TO OUR FACTORY AT ANY TIME
* ACERETECH is original manufacturer.
* If you interested in our products and we can fulfill your request , you may pay a visit to ACERETECH Factory.
* The meaning of visiting supplier, since seeing is believing, ACERETECH Machinery with own manufacture and developed& research team, we can send you engineers and make sure the high efficiency after-sales service.

SEE ACERETECH MACHINE HOW TO ENSURE THE QUALITY
* In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
* Each component before assembly needs strict control by inspecting personnel.
* Each assembly is in charge by a master who has working experience for more than 15 years
* After all the equipment are completed, we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory

THE AFTER-SALE SERVICE OF ACERETECH MACHINERY

* After finishing the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools.
* After the commissioning, we will package the equipment by the standard export package for shipment.
* According to the customer's request, we can arrange our engineers to customers' factories to do the installation and training.
* Engineers, sales managers, and after-sales service managers will form an after-sales team, online and offline, to follow the customers' project.