Building Material Making Machinery

Monthly Deals Seam Lock Roll Hidden Roof Forming Tile Making Machine

XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.
  • Tile Type:Glazed Steel
  • Certification:CE, ISO
  • Condition:New
  • Customized:Customized
  • Usage:Floor
  • Transmission Method:Motor Drive

Base Info

  • Model NO.:YX71-478 Roll former for boltless roof
  • Thickness:0.4-0.6mm
  • Overall Dimensions:7180*1550*1650mm
  • Transport Package:40gp′*1
  • Specification:6T
  • Trademark:LIMING MACHINERY
  • Origin:Fujian, China (Mainland)
  • Production Capacity:600

Description

Please visit the web site: liming2018.en.made-in-china.com for detailed information

Below pictures are for your reference only





Monthly Deals Seam Lock Roll Hidden Roof Forming Tile Making Machine
Monthly Deals Seam Lock Roll Hidden Roof Forming Tile Making Machine
Monthly Deals Seam Lock Roll Hidden Roof Forming Tile Making MachineMonthly Deals Seam Lock Roll Hidden Roof Forming Tile Making MachineMonthly Deals Seam Lock Roll Hidden Roof Forming Tile Making MachineMonthly Deals Seam Lock Roll Hidden Roof Forming Tile Making MachineMonthly Deals Seam Lock Roll Hidden Roof Forming Tile Making MachineMonthly Deals Seam Lock Roll Hidden Roof Forming Tile Making Machine
Monthly Deals Seam Lock Roll Hidden Roof Forming Tile Making Machine


 

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.

Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 

Terms Of Trade

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.