How to fill the wall-hung boiler with water
Wall-hung boilers are common heating equipment in modern homes, and their water filling operation is an important part of daily maintenance. The correct water injection method not only ensures the efficient operation of the wall-hung boiler, but also extends its service life. This article will introduce in detail the steps, precautions and FAQs for filling the wall-mounted boiler with water to help users complete the operation easily.
1. Preparations before filling the wall-hung boiler with water

Before filling with water, make sure that the following preparations have been completed:
| steps | Operation content |
|---|---|
| 1 | Turn off the power supply to the wall-hung boiler to ensure safe operation. |
| 2 | Check the wall-mounted boiler pressure gauge to confirm the current pressure value (normal range 1-1.5Bar). |
| 3 | Prepare appropriate water injection tools (such as hoses, funnels, etc.). |
| 4 | Make sure the water supply source is clean to avoid impurities entering the system. |
2. Detailed explanation of the water filling steps of the wall-hung boiler
The following is the specific operation process for water filling the wall-hung boiler:
| steps | Operation content |
|---|---|
| 1 | Locate the fill valve (usually a blue knob) on the bottom of the boiler. |
| 2 | Slowly turn the water filling valve counterclockwise and stop when you hear the sound of water flowing. |
| 3 | Observe the pressure gauge. When the pointer reaches 1.5Bar, close the water injection valve clockwise. |
| 4 | Check whether there is any water leakage in the system, and restart the wall-hung boiler after confirming that there are no abnormalities. |
3. Precautions during water injection
To avoid equipment damage caused by operating errors, please pay attention to the following matters:
| Things to note | Description |
|---|---|
| 1 | The pressure must not exceed 2Bar when filling water, otherwise the safety valve may be triggered to release pressure. |
| 2 | After the water injection is completed, it needs to be exhausted to prevent air in the system from affecting the heating effect. |
| 3 | It is necessary to prevent pipes from freezing when filling water in winter. It is recommended to operate when the room temperature is higher than 5℃. |
| 4 | If the pressure is still unstable after multiple injections of water, there may be water leakage or equipment failure. |
4. Frequently Asked Questions
The following are common questions and solutions for users when filling water:
| question | Solution |
|---|---|
| Water injection valve cannot be opened | Check whether the valve is corroded and contact a professional to handle it if necessary. |
| No change in pressure gauge | Confirm that the water injection valve is fully open and check whether the pipe is blocked. |
| Pressure drops rapidly after water injection | There may be water leakage in the system, and the pipe connections need to be fully inspected. |
5. Summary
Filling a wall-hung boiler with water is a simple but careful operation. Through the step-by-step guidance in this article, users can easily complete the water filling task. Regularly checking the pressure and filling water appropriately can effectively ensure the stable operation of the wall-mounted boiler. If you encounter a problem that cannot be solved, it is recommended to contact professional maintenance personnel in time.
Note: The content of this article is based on discussions on wall-mounted boiler maintenance in hot topics across the Internet in the past 10 days to ensure the timeliness and practicality of the information.
check the details
check the details